ELECTRIC CODE

Home » ELECTRIC CODE

P-2 ELECTRIC CODE

P-2-1 PURPOSE

The purpose of this chapter is to establish the adoption of the National Electrical Code so as to require all buildings constructed within the City of Fort Pierre are in conformance with these codes and are wired in a proper manner to ensure the prevention of fires.

Source: Ord. 845

Authority: SDCL 9-33-4.1, 9-33-5

P-2-2 NATIONAL ELECTRICAL CODE

There is hereby adopted that certain code known as the National Electrical Code as adopted by the State of South Dakota, in whole except such portions as have been deleted, modified, or amended and as so deleted, modified or amended and filed in the City Finance Office. Additional deletions, modifications, and amendments may from time to time be made by the City Council and shall be effective upon their adoption and filing with the City Finance Officer or his designee. The City Finance Officer or his designee shall keep and maintain a master copy of said code including all future deletions, modifications, or amendments which may be adopted by the City Council as herein provided and the same shall be available and subject to public inspection at all reasonable times.

Source: Ord. 809, 845, 1012

Authority: SDCL 9-19-7, 9-33-4.1, 9-33-5

Cross Reference: SDCL 11-10-5